Reading notes is one thing; performing under exam conditions is another. The ITExamDownload test engines recreate the pace and pressure of the Construction-Manager exam environment with timed practice modes, and the CMAA Certified Construction Manager (CCM) practice questions give you a full rehearsal before exam day.
CMAA Construction-Manager Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Contract Administration | 10% | - Contract Types and Structures
|
| Topic 2: Technology | 5% | - Construction Technology
|
| Topic 3: Risk Management | 10% | - Risk Identification and Assessment
|
| Topic 4: Quality Management | 10% | - Standards Compliance
|
| Topic 5: Professional Practice | 10% | - Leadership and Communication
|
| Topic 6: Sustainability | 5% | - Energy Efficiency
|
| Topic 7: Time Management | 10% | - Scheduling
|
| Topic 8: Safety Management | 10% | - Incident Management
|
| Topic 9: Program & Project Management | 20% | - Project Planning and Coordination
|
| Topic 10: Cost Management | 10% | - Budget Development and Control
|
Construction-Manager Certification Exam — Your Questions, Answered
The Construction-Manager exam is the official CMAA exam behind CMAA Certified Construction Manager (CCM) — passing it earns you the Certified Construction Manager certification, a credential positioned at the Professional level. It is built for candidates who want to validate the skills measured by CMAA Certified Construction Manager (CCM). Depending on your track, the exam is also linked to the CACM (Certified Associate Construction Manager) certification, so one pass can move you toward more than one CMAA credential.
The Construction-Manager exam presents 175 (150 scored + 25 unscored pilot questions) questions to be completed within 240 minutes. That pace leaves little room for second-guessing: read each question carefully on the first pass, flag the ones you want to revisit, and keep moving instead of stalling on a single item. Before exam day, run at least one full timed session in the ITExamDownload desktop or online test engine with a comparable question load — a steady rhythm under the clock is a trainable skill, and it is often what separates a pass from a near miss.
To pass the Construction-Manager exam you need 72% (108 out of 150 scored questions), and the official registration fee is $575 - $750 (depending on CMAA membership status). Keep in mind that a failed attempt means paying that fee again in full — retakes are not discounted. Given the cost, self-test before you book: if you can score comfortably above the passing mark on two or three consecutive timed ITExamDownload practice tests, your budget is far better spent on the exam itself than on a retake.
Candidates must meet specific educational and experience requirements: Bachelor's degree in construction management or related field plus 4 years of qualifying experience, OR 8 years of general design/construction experience plus 48 months of Responsible-in-Charge (RIC) experience Because CMAA revises its certification programs from time to time, treat this as a starting point rather than the final word. Confirm the current eligibility requirements on the official CMAA exam page before you register.
Yes. A free PDF demo of the Construction-Manager practice questions is available, so you can check the question style and answer quality before spending anything. Every purchase also includes 365 days of free updates — whenever CMAA adjusts the CMAA Certified Construction Manager (CCM) blueprint, your material is refreshed at no cost during that period. After the first year, you can extend the update service at a 50% discount from your member zone.
ITExamDownload backs your purchase with a 100% Money Back Guarantee. If you take the corresponding exam within 60 days of purchase and do not pass, you can claim a full refund by submitting a scanned copy of your exam enrollment slip together with the official Score Report PDF within 2 days of your exam date; approved claims are processed within 7 days. The guarantee applies only to the exam matching your purchase, the candidate name must match the payer name, and it does not cover attempts taken within 3 days of purchase, candidates who downloaded the material but never sat the exam, expired orders, or free materials. If you would rather keep preparing, you can exchange the product for two free exam preparation packages of equal value and keep the update service on your original purchase.
Delivery is instant: your download is available right after payment, and a copy is emailed to you within one minute. If nothing arrives within 2 hours, check your spam folder and contact our support team. There is no limit on the number of computers you can install the software on.
The CMAA Certified Construction Manager (CCM) syllabus is organized into 10 domains. Among the headline areas are Professional Practice (10%), Safety Management (10%), Sustainability (5%). Rather than copying every subtopic here, we keep the complete, current outline in the Exam Topics section above — work through it domain by domain with the ITExamDownload Construction-Manager practice questions so nothing on the blueprint catches you off guard.
CMAA Certified Construction Manager (CCM) Sample Questions:
BIM best assists the CM with
- A. gathering energy, cost, facility maintenance, safety, and spatial data.
- B. planning, coordination, and control of the project.
- C. managing time, safety, quality, and facility operations.
- D. developing drawings and facility management.
Correct Answer: B 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
Contract administration includes, but is not limited to, planning for implementation of drawings, specifications, and
- A. licenses.
- B. standards.
- C. permits.
- D. owner's scope of work.
Correct Answer: B 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
The general contractor on a $1.2 billion terminal at an airport finds out that, due to supply chain issues, there is a 60% risk that they will not be able to get steel onsite for 10 weeks. The late start date of steel installation is four weeks away. Such a delay would cost the owner $75,000 per week to recover. What is the expected monetary value of risk?
- A. $2.7 million
- B. $450,000
- C. $1.2 million
- D. $270,000
Correct Answer: A 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
A construction manager is responsible for the bid review and evaluation of an $85 million high school project.
All bids must be submitted in person at the client's Purchasing Office by 1:00 PM EST and stamped by the CM's team. While preparing for the bid opening, the CM noticed that one of the contractor's bids was submitted a day earlier to a new clerk, but was date and time stamped after the bids were due. What should the CM do in this situation?
- A. Put the contractor's unopened bid in tight security until the bid opening has been completed.
- B. Send the bid back to the contractor and apologize for the mishap.
- C. Include the unopened bid. since it clearly was an oversight.
- D. Inform the Owner and review the instructions to bidders for guidance on how to proceed.
Correct Answer: D 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
The narrative accompanying a CM-developed construction cost estimate during the design phase should include which of the following?
- A. CM's recommendation of improvements to specifications and quality of materials
- B. Means and methods of construction
- C. Suggestions for value management of building systems and other opportunities for savings
- D. Written confirmation of verbal data and assumptions made
Correct Answer: D 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).