Professional IT staff update the exam simulator engine every day — everything we sell is latest and valid. The NCARB ARE 5.0 Project Management (PjM) dumps at ITExamDownload: 78 practice questions for the Project-Management exam in 2026.
NCARB Project-Management Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Resource Management | 15% | - Project Team Management
|
| Topic 2: Project Work Planning | 30% | - Scheduling and Work Planning
|
| Topic 3: Contracts | 25% | - Consultant and Contractor Agreements
|
| Topic 4: Project Execution | 30% | - Project Coordination
|
NCARB Project-Management Exam: Engine Answers
The NCARB ARE 5.0 Project Management (PjM) is NCARB's certification exam for Architect Registration Examination, at the Professional level. It's demanding enough to intimidate — timed practice is the cure. Related credentials include Architect Registration Examination (ARE 5.0), Architect Licensure.
180 minutes for 75 questions. The ITExamDownload APP engine imitates the real test — set timed exams, mark performance, point out mistakes — so exam day feels rehearsed.
The NCARB ARE 5.0 Project Management (PjM) blueprint spans 4 domains — including Resource Management (15%), Project Execution (30%), Contracts (25%). The complete outline above lists every subtopic; our IT staff keep the material aligned daily.
Candidates must obtain ARE eligibility through a U.S. jurisdiction and typically complete or be actively completing the Architectural Experience Program (AXP). Eligibility rules change over time, so verify the current requirements on the official page (official Project-Management exam page) before registering.
$235 USD per attempt, Scaled score determined by NCARB to pass. Retakes cost the full fee — practice whenever you want with the 78 practice questions for the Project-Management exam at ITExamDownload.
Soon after payment you receive the NCARB ARE 5.0 Project Management (PjM) material by automatic email — about a minute, with Credit Card payment and a strict information system keeping money and data safe; our 7*24 service replies within 2 hours, even on official holidays. If you fail the corresponding Project-Management exam within 60 days of purchase, we refund in full: send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam, processed within 7 days. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. Or exchange for two equal-value products free.
Yes — download the free NCARB ARE 5.0 Project Management (PjM) demo and feel the engine before paying. Purchases include 365 days of free updates by email; renew afterward at 50% off.
NCARB ARE 5.0 Project Management (PjM) Sample Questions:
The architect's contract with the owner has a budget of construction cost, and the architect has established a budget of cost in the mechanical engineer's contract. The mechanical bid package is 36% over the budget.
What is the engineer required to do?
- A. Obtain additional bidders for this part of the project
- B. Modify the documents to reduce the cost
- C. Negotiate cost savings with the subcontractor
Correct Answer: B 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).

Refer to the exhibit.
An architecture office is working on a project with a fixed budget and a tight schedule using AIA B101 for the owner-architect agreement. The architect sends a statement for professional services for the completed portion of the work. Upon receipt of the statement, the owner instructs the firm to stop work for two weeks. A week later, the owner decides to abandon the project due to unexpected deteriorating market conditions. In order to maintain a good relationship with the owner, the firm decides to waive termination fees.
What is the architect's total compensation for the project?
- A. $30,400.00
- B. $25,000.00
- C. $24,000.00
Correct Answer: A 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
During the preparation of the construction documents, it was noted that the survey inaccurately located the property line. Consequently, the parking layout had to be redesigned to fit within the corrected property boundary.
The architect's additional costs and associated delay are the responsibility of which one of the following parties?
- A. Civil Engineer
- B. Architect
- C. Owner
- D. Surveyor
Correct Answer: C 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
What is the architect's role regarding shop drawings?
- A. Preparing and submitting them to the owner
- B. Reviewing them for compliance with design intent
- C. Approving changes without owner input
- D. Issuing shop drawings to subcontractors
Correct Answer: B 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
Who is responsible for verifying the accuracy of the contractor's payment application?
- A. Architect
- B. Construction manager
- C. Owner
- D. Contractor's accountant
Correct Answer: A 🗳️
Explanation: Only visible for ITExamDownload members. You can sign-up / login (it's free).
Viewing page 1 out of 16 pages.
Viewing questions 1-5 out of 78 questions.