NEW QUESTION 18
Consider the following section of pseudocode

Display "You exceeded the number of tries to enter a password. Your account is now locked. Call customer.

For this section of code, which of the following issues should be identified during a code review?
1. Variables have not been properly defined with meaningful names
2. There are unused variables defined
3. Divisors are not tested for zero
4. Loop counters are not properly initialized
5. There are endless loops
6. There are statements within the loop that should be outside the loop

  • A. 7, 3, 4, 6
  • B. 1, 3, 4, 5
  • C. 1, 2, 4, 6
  • D. 2, 3, 5, 6

Answer: C

 

NEW QUESTION 19
You have to review the following user story that will be developed and tested during the next Sprint:
As a potential conference attendee, I want to be able to register for the conference online, so that registration is simple and paperless.
The following acceptance criteria are also mentioned:
i) Payment can be made via PayPal, Debit or Credit Cards
ii) An acknowledgement email is sent to the attendee after submitting the form iii) Protection against spam is working as expected iv) Information from the form is stored in the registrations database v) All incorrect user inputs are flagged by the system Which of the following correctly shows which acceptance criteria are testable?

  • A. i, iii, v are testable
  • B. i, ii, iv are testable
  • C. iii, iv, v are testable
  • D. ii, iv, v are testable

Answer: B

 

NEW QUESTION 20
An increased proportion of automated test coverage often leads to a greater degree of manual testing that follows reactive strategies, because:

  • A. Reactive strategies consider the current context and status of the project and the system under test. To be able to adopt to this status most flexible a greater degree of manual testing is necessary
  • B. Many of the tests that can be prepared upfront, will be automated which enables the testers to spend more time for execution of manual tests
  • C. An increase of the proportion of automated test increases test coverage, and the uncovered areas are to be tested reactively
  • D. If the proportion of automated tests increases, manual tests focus on the riskiest areas which are identified reactively

Answer: B

 

NEW QUESTION 21
When using a process-compliant approach to testing a safety-critical project what is an important aspect of test automation?

  • A. It must implement automated checklists
  • B. It must provide traceability back to the requirements and results documentation
  • C. It must incorporate model-based testing
  • D. It must provide exhaustive regression testing

Answer: B

 

NEW QUESTION 22
"As the leader of the marketing department, I want to have a content management system so that my employees can edit and provide quality content to the readers" Which of the following requirements engineering techniques would be the MOST effective for identifying and prioritizing user stories for the given Epic?

  • A. Class Diagrams
  • B. Use Cases
  • C. Defining Personas
  • D. Story mapping
  • E. Storyboarding

Answer: D,E

 

NEW QUESTION 23
You are working in a project that developed a product that has reached a stable state and is deployed on different HW configurations all over Europe.
You management decided to use your project as Proof of Concept for adopting CI as a new way of working. The POC was implemented on one set of hardware and was successful.
Which of the following actions is a good next step?

  • A. Implement code to dynamically select CI tests, executing only test cases affected by changes
  • B. Speed up test execution by decreasing the amount of User Interface (UI) testing to get faster feedback from the CI tests
  • C. Reduce the number of tests in the CI test suite, to improve the benefit of the CI approach
  • D. Enable different test configurations in the CI process to test different configurations that are deployed in the market

Answer: D

 

NEW QUESTION 24
Summarize the characteristics of test automation in relation to development projects.

  • A. Test automation supports the goals of an iteration directly, e.g., by reducing the regression risk associated with stability of the system
  • B. Supportive test automation effort must be done in the teams of the iteration teams themselves
  • C. Test automation can play an important role in test environment configuration and test release acquisition
  • D. In large projects, there is usually one best solution that fits all needs, and so. on dedicated test automation strategies fits best

Answer: C

 

NEW QUESTION 25
Whose perspective should be used when a user story is created?

  • A. End user
  • B. User acceptance tester
  • C. Automated user software
  • D. Stakeholder paying for the project

Answer: A

 

NEW QUESTION 26
Which of the following is a correct statement?

  • A. Test automation is a test objective
  • B. Test automation is a procedure
  • C. Test automation is a methodology
  • D. Test automation is a strategy

Answer: C

 

NEW QUESTION 27
The challenges described below are of test automation in agile settings or agile projects. Which is the correctly described one?

  • A. Unit testing automation is the most critical test automation needed in agile and covers most of the testing challenges in agile quality of code and gives good test coverage
  • B. Test deployment time is one of the challenges of agile testing, as deploying slow is not possible in short iterations
  • C. Test Execution Time is not critical in agile as there are fewer tests written, and they are designed as checklists or high-level tests which reduces the time it takes to execute them
  • D. Resource's availability is a challenge in automating tests in agile settings, as they are needed to create, maintain, and execute the test suite

Answer: D

 

NEW QUESTION 28
When test cases are re-run after refactoring, what should always be verified'?

  • A. That the branch coverage is the same or increased
  • B. That they provide better logging than before
  • C. That they provide the same results as before
  • D. That tests that have now been made redundant are removed from the test set

Answer: C

 

NEW QUESTION 29
Which of the following is an expected problem that often occurs with automation test suites?

  • A. The test execution time becomes longer making it difficult to get all the tests run as often as desired
  • B. The time it takes to create new tests increases exponentially as new features are added to the code
  • C. The test suite continues to grow making source control difficult to manage
  • D. The defects become prohibitive when trying to execute the suite

Answer: A

 

NEW QUESTION 30
Why is it important to refactor test cases to make them easier to understand?

  • A. Because users will apply them as use cases for UAT and need to be able to determine the mam path and alternate paths
  • B. Because they will be used as the code-under-test changes, so they need to be easy for other testers to understand and modify
  • C. Because developers need to use them for performance testing
  • D. Because the observable behavior of the test case will change and the product owner needs to be able to clearly see what the behavior should be

Answer: D

 

NEW QUESTION 31
You are testing a new feature in the current iteration. The feature is supposed to take the input of a name and return the number of characters in the name. This information is used by another feature that will determine the size needed on a form. The acceptance criteria state the following
1) a name of up to 30 characters should be accepted
2) standard error processing should be in place to limit user errors
The developers are using TDD and you have asked to see their tests. This is what they gave you

When yourun your manual tests you are finding that when you use the following inputs you get the associated results:
From these results what can you conclude about the TDD process?

  • A. The tests are insufficient and need to include more options
  • B. The developers are not running the tests prior to releasing the code
  • C. The story needs to be enhanced to include the capabilities that are causing errors
  • D. The tests cannot be passing

Answer: A

 

NEW QUESTION 32
You have been asked to supply the data file for a data-driven test automation script that will be used to test the following story:
As a customer I want to be told how many items I need to purchase, so I can receive free shipping You have been told the automation will verify whether or not the free shipping message is displayed. Which of the following columns should appear in your data file to support the automated testing of this story?

  • A. item ID quantity purchased free shipping (y/n), item shipping cost total shipping cost
  • B. customer name # items, price of items, total shipping cost
  • C. item ID quantity purchased free shipping (y/n)
  • D. quantity purchased, free shipping (y/n), total shipping cost

Answer: A

 

NEW QUESTION 33
Which of the following correctly describes positive characteristic of unit tests?

  • A. Unit test can be derived from the given epics and existing code of the test object
  • B. Unit tests should be independent from system components other than the one to be tested
  • C. A unit test should be written against large and complex code structures to get fast and feedback of the code quality
  • D. While refactoring, the redesign of the unit test to adapt to the changed code is crucial

Answer: B

 

NEW QUESTION 34
......


ISQI CTAL-ATT Exam Syllabus Topics:

TopicDetails
Topic 1
  • Understand the challenges of test automation in agile settings
  • Understand practical task-list for Refactoring Test cases
Topic 2
  • Understand the importance of refactoring test cases in Agile projects
  • Apply continuous integration (CI) and summarize its impact on testing activities
Topic 3
  • Apply data-driven and keyword-driven test techniques to develop automated test scripts
  • Apply test-driven development (TDD) in the context of a given example in an Agile project
Topic 4
  • Understand how to apply test automation to a given test approach in an Agile environment
  • Understand differences between various test approaches
Topic 5
  • Analyze code as part of a code review to identify defects and technical debt
  • Understand how to manage guidelines for a formulation of a scenario
Topic 6
  • Explain differences between Mission critical and non-critical
  • Apply behavior-driven development (BDD) in the context of a given user story in an Agile project
Topic 7
  • Continuous Integration, continuous testing, and continuous delivery
  • Understand the use Experienced-based techniques

 

CTAL-ATT [Jan-2023] Newly Released] CTAL-ATT Exam Questions For You To Pass: https://pass4sure.itexamdownload.com/CTAL-ATT-valid-questions.html